For construction and equipment lenders

Commercial review of the file your monitor doesn't cover

Most construction loan monitors come from a real estate background. They can validate a schedule of values for steel and drywall. They generally cannot tell you whether a $4M transformer order is priced at market, whether the milestone payment structure exposes you if the manufacturer fails, or whether factory acceptance testing has actually been passed on equipment the borrower is drawing against.

That is the gap Haskins Capital fills — as a specialist overlay alongside your existing monitor, not a replacement for it.

Independence

Flat fee. Always.

Lender engagements are billed at a flat fee per file. There is no contingent compensation, no percentage of reductions, and no savings share of any kind on the lender side of this practice. A reviewer paid a percentage of what he finds has an incentive to find it. That structure has no place in an independent opinion delivered to a credit file.

  1. 01Flat fee per file, quoted and agreed in writing before work begins.
  2. 02No contingent, percentage, or success-based compensation on any lender engagement.
  3. 03No advocacy. We report findings; the credit decision is yours.
  4. 04No engagement where we advise the owner, contractor, or a major vendor on the same project.
  5. 05No owner-side work accepted from a borrower whose loan we are currently reviewing.

Services

Three ways to engage.

Before closing

Pre-Close Commercial Review

We read the construction or EPC contract, the major equipment purchase orders, and the payment structure, then deliver a risk memo ranked by dollar exposure to the lender. Delivered ahead of credit committee, while it is still useful.

During construction

Draw Package Commercial Review

Stored materials verification, milestone trigger validation, retainage compliance, and confirmation that equipment being funded has passed acceptance. Layered on top of your existing field monitor.

When a file drifts

Second Look on a Troubled Loan

For special assets and workout groups. Where the money went, what was funded against work not in place, and what commercial leverage remains in the contract documents.

All lender engagements are billed at a flat fee per file, quoted in writing before work begins. Nothing is ever quoted verbally. Fee schedule provided with the sample report.

Scope boundary

What we review — and what we do not.

This boundary is deliberate. It keeps the work squarely in commercial and contractual analysis and outside the practice of engineering.

In scope

  • Contract commercial terms, risk allocation, and change management provisions
  • Payment structure, milestone triggers, retainage, and front-loading
  • Stored materials and off-site equipment payment exposure
  • Long-lead equipment pricing, lead-time risk, and supplier failure exposure
  • Change order pricing tested against the schedule of values
  • Vendor and unit pricing benchmarked to market rate data

Not in scope

  • Design review, constructability opinion, or engineering certification
  • Budget adequacy opinions requiring a professional engineer's seal
  • Site inspection and field observation of work in place

Where a lender's report template requires a sealed opinion, that section is performed by a licensed professional engineer under subcontract and identified as such in the report. We do not sign opinions we are not licensed to give.

Disclosure

We also advise project owners. Here is why that helps you.

Twenty years on the owner's side means I know exactly how a draw package gets assembled to look better than the job actually is. That is not a conflict — it is the reason to hire me. What would be a conflict is working both sides of the same project, or taking money from a borrower while reporting on their loan. We do neither, and the rule is published.

Insurance certificates, W-9, conflicts of interest policy, and vendor onboarding documentation available on request.